Region Region Owner Primary
Contractor
Name of Project Business
Field
Construction
Type
Period Contract Amount
(KRW 1,000)
UAE ADMA-OPCO Hyundai Engineering & Construction Co., Ltd UAE SARB Mechanical Package Refinery Mech/Piping/Stl.Str 2015.06.15~2018.07.31
Korea LG Chem Co., Ltd LG Chem Co., Ltd SAN Extension Machine / pipe installation work Petrochemical Mech/Piping 2015.05.29~2015.12.31
Korea POSCO Co., Ltd POSCO E&C Co., Ltd Gwangyang No.5 Blast Furnace 1st Repair body (construction) Steel Mill Mech 2015.05.21~2016.06.30
Korea Boryeong LNG Terminal Co., Ltd GS Engineering & Construction Co., Ltd Boryeong LNG Terminal LPG Tank Project Cryogenic Insulation Work Gas Cryogenic Insulation Work 2015.05.18~2016.12.31
UAE ENEC Hyundai Engineering & Construction Co., Ltd Barakah Nuclear Power Plant 3&4 Project Nuclear Piping 2015.05.12~2019.06.30
Philippines Petron Corporation DL Co., Ltd Philippines, RMP-2 Mechanical PKG. B Refinery Mech/Piping 2015.03.01~2015.08.30
Korea POSCO Co., Ltd POSCO Engineering Co., Ltd Kwangyang LNG Terminal Project Gas Insulation 2015.03.01~2016.09.30
Korea Boryeong LNG Terminal Co., Ltd SK Engineering & Construction Co., Ltd Boryeong LNG Terminal Project_Insulation/Cold Insulation Construction Gas Insulation 2015.03.01~2017.05.31
Korea Korea Hydro & Nuclear Power Co., Ltd Hyundai Engineering & Construction Co., Ltd Shinhanul Units 1 and 2 Juji Facility Construction Tank Nuclear Tank 2015.01.12~2019.06.30
Korea Korea Hydro & Nuclear Power Co., Ltd Hyundai Engineering & Construction Co., Ltd Shinhanul Units 1 and 2 Juji Facility Construction Air conditioning Equipment Nuclear Mech 2015.01.12~2023.09.30
Korea GS Caltex Co., Ltd GS Caltex Co., Ltd 2015 GSC Insulation Annual Work Refinery Insulation 2015.01.01~2015.12.31
Korea LG Chem Co., Ltd LG Chem Co., Ltd 2015 Yeosu factory scheduled maintenance Petrochemical Mech/Piping 2015.01.01~2015.12.31
  • 지역: UAE 발주처: ADMA-OPCO
    공사명: UAE SARB Mechanical Package 사업분야: Refinery 공종: UAE SARB Mechanical Package
    기간: 2015.06.15~2018.07.31 계약금액:
  • 지역: Korea 발주처: LG Chem Co., Ltd
    공사명: SAN Extension Machine / pipe installation work 사업분야: Petrochemical 공종: SAN Extension Machine / pipe installation work
    기간: 2015.05.29~2015.12.31 계약금액:
  • 지역: Korea 발주처: POSCO Co., Ltd
    공사명: Gwangyang No.5 Blast Furnace 1st Repair body (construction) 사업분야: Steel Mill 공종: Gwangyang No.5 Blast Furnace 1st Repair body (construction)
    기간: 2015.05.21~2016.06.30 계약금액:
  • 지역: Korea 발주처: Boryeong LNG Terminal Co., Ltd
    공사명: Boryeong LNG Terminal LPG Tank Project Cryogenic Insulation Work 사업분야: Gas 공종: Boryeong LNG Terminal LPG Tank Project Cryogenic Insulation Work
    기간: 2015.05.18~2016.12.31 계약금액:
  • 지역: UAE 발주처: ENEC
    공사명: Barakah Nuclear Power Plant 3&4 Project 사업분야: Nuclear 공종: Barakah Nuclear Power Plant 3&4 Project
    기간: 2015.05.12~2019.06.30 계약금액:
  • 지역: Philippines 발주처: Petron Corporation
    공사명: Philippines, RMP-2 Mechanical PKG. B 사업분야: Refinery 공종: Philippines, RMP-2 Mechanical PKG. B
    기간: 2015.03.01~2015.08.30 계약금액:
  • 지역: Korea 발주처: POSCO Co., Ltd
    공사명: Kwangyang LNG Terminal Project 사업분야: Gas 공종: Kwangyang LNG Terminal Project
    기간: 2015.03.01~2016.09.30 계약금액:
  • 지역: Korea 발주처: Boryeong LNG Terminal Co., Ltd
    공사명: Boryeong LNG Terminal Project_Insulation/Cold Insulation Construction 사업분야: Gas 공종: Boryeong LNG Terminal Project_Insulation/Cold Insulation Construction
    기간: 2015.03.01~2017.05.31 계약금액:
  • 지역: Korea 발주처: Korea Hydro & Nuclear Power Co., Ltd
    공사명: Shinhanul Units 1 and 2 Juji Facility Construction Tank 사업분야: Nuclear 공종: Shinhanul Units 1 and 2 Juji Facility Construction Tank
    기간: 2015.01.12~2019.06.30 계약금액:
  • 지역: Korea 발주처: Korea Hydro & Nuclear Power Co., Ltd
    공사명: Shinhanul Units 1 and 2 Juji Facility Construction Air conditioning Equipment 사업분야: Nuclear 공종: Shinhanul Units 1 and 2 Juji Facility Construction Air conditioning Equipment
    기간: 2015.01.12~2023.09.30 계약금액:
  • 지역: Korea 발주처: GS Caltex Co., Ltd
    공사명: 2015 GSC Insulation Annual Work 사업분야: Refinery 공종: 2015 GSC Insulation Annual Work
    기간: 2015.01.01~2015.12.31 계약금액:
  • 지역: Korea 발주처: LG Chem Co., Ltd
    공사명: 2015 Yeosu factory scheduled maintenance 사업분야: Petrochemical 공종: 2015 Yeosu factory scheduled maintenance
    기간: 2015.01.01~2015.12.31 계약금액:
Download the Performance List