DAEAH E&C is a specialized construction company for plant mechanical equipment.

Civil Engineering

MAIN PROJECT

No List.
공지사항 목록
Region Region Owner Primary
Contractor
Name of Project Business
Field
Construction
Type
Period Contract Amount
(KRW 1,000)
Mexico POSCO-MEXICO POSCO Co., Ltd CGL No.2 PROJECT Steel Mill Mech/Piping/Stl.Str 2011.09.27~2013.06.30
Korea GS Caltex Co., Ltd GS Engineering & Construction Co., Ltd GSC VGOFCC PROJECT-Mech. Refinery Mech/Piping 2011.08.01~2013.06.01
Korea LG Chem Co., Ltd LG Chem Co., Ltd The 3rd Yeosu Devided furnace of refractories replace work Petrochemical Mech 2011.07.01~2011.12.01
Vietnam Posco-VST POSCO-VST CAPL Project/Machinery & Piping Installation Steel Mill Mech/Piping 2011.06.20~2012.02.28
UAE ABUDHABI POLYMERS Co.LTD Hyundai Engineering & Construction Co., Ltd BOROUGE3 Utility & Off-Site Steel Structure UAE Refinery Stl.Str 2011.06.01~2014.06.30
Korea Korea Midland Power Co., Ltd Kumho Engineering & Construction Co., Ltd Insulation work of complex unit 3 of Incheon Power Insulation 2011.05.01~2012.12.01
Korea POSCO Co., Ltd POSCO E&C Co., Ltd Phohang New Steel Manuf. Facility DUCT DOWN Project Steel Mill Mech/Piping 2011.04.01~2011.11.01
BAHRAIN UNITED STEEL COMPANY Samsung Engineering Co., Ltd SULB Steel Mill Project BAHRAIN Steel Mill Mech/Piping/Stl.Str 2011.04.01~2012.11.30
Korea LG Chem Co., Ltd D&O Co., Ltd LG Chemical 4AA U/T BA Piping & Machinery Installation Petrochemical Mech/Piping 2011.03.07~2011.12.31
Korea LG Chem Co., Ltd LG Chem Co., Ltd LG Chemical #1Factory ABS Piping & Machinery Installation Petrochemical Mech/Piping 2011.03.04~2011.06.30
Korea POSCO Co., Ltd POSCO E&C Co., Ltd Cryogenic Tank Insulation of Kwangyang No.4 LNG Tank Expansion Gas Cryogenic Insulation Work 2011.01.01~2013.05.01
UAE TAKREER GS Engineering & Construction Co., Ltd RRE #2 PKG PI-01, 03 Refinery Insulation/Painting 2011.01.01~2014.10.30
  • 지역: Mexico 발주처: POSCO-MEXICO
    공사명: CGL No.2 PROJECT 사업분야: Steel Mill 공종: CGL No.2 PROJECT
    기간: 2011.09.27~2013.06.30 계약금액:
  • 지역: Korea 발주처: GS Caltex Co., Ltd
    공사명: GSC VGOFCC PROJECT-Mech. 사업분야: Refinery 공종: GSC VGOFCC PROJECT-Mech.
    기간: 2011.08.01~2013.06.01 계약금액:
  • 지역: Korea 발주처: LG Chem Co., Ltd
    공사명: The 3rd Yeosu Devided furnace of refractories replace work 사업분야: Petrochemical 공종: The 3rd Yeosu Devided furnace of refractories replace work
    기간: 2011.07.01~2011.12.01 계약금액:
  • 지역: Vietnam 발주처: Posco-VST
    공사명: CAPL Project/Machinery & Piping Installation 사업분야: Steel Mill 공종: CAPL Project/Machinery & Piping Installation
    기간: 2011.06.20~2012.02.28 계약금액:
  • 지역: UAE 발주처: ABUDHABI POLYMERS Co.LTD
    공사명: BOROUGE3 Utility & Off-Site Steel Structure UAE 사업분야: Refinery 공종: BOROUGE3 Utility & Off-Site Steel Structure UAE
    기간: 2011.06.01~2014.06.30 계약금액:
  • 지역: Korea 발주처: Korea Midland Power Co., Ltd
    공사명: Insulation work of complex unit 3 of Incheon 사업분야: Power 공종: Insulation work of complex unit 3 of Incheon
    기간: 2011.05.01~2012.12.01 계약금액:
  • 지역: Korea 발주처: POSCO Co., Ltd
    공사명: Phohang New Steel Manuf. Facility DUCT DOWN Project 사업분야: Steel Mill 공종: Phohang New Steel Manuf. Facility DUCT DOWN Project
    기간: 2011.04.01~2011.11.01 계약금액:
  • 지역: BAHRAIN 발주처: UNITED STEEL COMPANY
    공사명: SULB Steel Mill Project BAHRAIN 사업분야: Steel Mill 공종: SULB Steel Mill Project BAHRAIN
    기간: 2011.04.01~2012.11.30 계약금액:
  • 지역: Korea 발주처: LG Chem Co., Ltd
    공사명: LG Chemical 4AA U/T BA Piping & Machinery Installation 사업분야: Petrochemical 공종: LG Chemical 4AA U/T BA Piping & Machinery Installation
    기간: 2011.03.07~2011.12.31 계약금액:
  • 지역: Korea 발주처: LG Chem Co., Ltd
    공사명: LG Chemical #1Factory ABS Piping & Machinery Installation 사업분야: Petrochemical 공종: LG Chemical #1Factory ABS Piping & Machinery Installation
    기간: 2011.03.04~2011.06.30 계약금액:
  • 지역: Korea 발주처: POSCO Co., Ltd
    공사명: Cryogenic Tank Insulation of Kwangyang No.4 LNG Tank Expansion 사업분야: Gas 공종: Cryogenic Tank Insulation of Kwangyang No.4 LNG Tank Expansion
    기간: 2011.01.01~2013.05.01 계약금액:
  • 지역: UAE 발주처: TAKREER
    공사명: RRE #2 PKG PI-01, 03 사업분야: Refinery 공종: RRE #2 PKG PI-01, 03
    기간: 2011.01.01~2014.10.30 계약금액:
Download the Performance List