본문 바로가기 주메뉴 바로가기

Business

DAEAH E&C is a specialized construction company for plant mechanical equipment.

Civil Engineering

MAIN PROJECT

No List.
공지사항 목록
Region Region Owner Primary
Contractor
Name of Project Business
Field
Construction
Type
Period Contract Amount
(KRW 1,000)
Korea LG Chem Co., Ltd LG Chem Co., Ltd PVC2 K-5 HWM PU EJECTOR Steam LINE blocking work Petrochemical Piping 2022.11.02~2022.12.30
Korea Hana Asset Trust Co., Ltd Hyundai Engineering & Construction Co., Ltd Air Conditioning Fire Construction at Hill State Daemyeong Central 2nd(section 2) Housing Facility Fire piping 2022.11.01~2026.02.24
Indonesia PT.Pertamina Hyundai Engineering Co., Ltd RDMP Project PKG-5 Insulation Work Petrochemical Mech/Piping 2022.11.01~2024.08.16
Korea Lotte Chemical Co., Ltd Lotte Chemical Co., Ltd Lotte Chemical Daesan ES PJT Fire Fighting UG Piping Construction Petrochemical Fire piping 2022.10.31~2023.05.31
Korea LG Chem Co., Ltd ZICNA Co., Ltd Chemistry Daesan P4 PROJECT Construction Plant Machine/Piping Construction-6 Petrochemical Mech/Piping 2022.10.25~2023.12.31
Korea POSCO Co., Ltd POSCO E&C Co., Ltd Pohang STS2 Cold Rolling_Mechanical Equipment Performance Restoration_Construction_Estimated Contract Steel Mill Mech 2022.10.21~2022.12.31
Korea LG Chem Co., Ltd LG Chem Co., Ltd HDPE 3 Factory TA Catalyst Decantation Replacement Construction Petrochemical Piping 2022.10.21~2022.12.30
Korea POSCO Co., Ltd POSCO E&C Co., Ltd Pohang 6 Coke New (Construction) 9th Insulation Steel Mill Insulation 2022.10.21~2023.12.31
Korea POSCO Co., Ltd Plantec Co., Ltd Po) Machine Corporation (PCI) Cold Cold Stream Flood Steel Mill Mech/Piping 2022.10.21~2023.03.30
Korea LG Chem Co., Ltd LG Chem Co., Ltd POE Pilot P5 Commissioning Support Service Support (piping) Petrochemical Piping 2022.10.19~2022.12.30
Korea Hyundai Steel Co., Ltd Hyundai Steel Co., Ltd 2 Grow furnace of handrail replacement construction around the tank Steel Mill Scafolding 2022.10.19~2022.12.13
Korea Hanju Co., Ltd Hanwha Engineering & Construction Co., Ltd Insulation work during Hanju gas combined heat and power generation Power Insulation 2022.10.17~2024.06.30
  • 지역: Korea 발주처: LG Chem Co., Ltd
    공사명: PVC2 K-5 HWM PU EJECTOR Steam LINE blocking work 사업분야: Petrochemical 공종: PVC2 K-5 HWM PU EJECTOR Steam LINE blocking work
    기간: 2022.11.02~2022.12.30 계약금액:
  • 지역: Korea 발주처: Hana Asset Trust Co., Ltd
    공사명: Air Conditioning Fire Construction at Hill State Daemyeong Central 2nd(section 2) 사업분야: Housing Facility 공종: Air Conditioning Fire Construction at Hill State Daemyeong Central 2nd(section 2)
    기간: 2022.11.01~2026.02.24 계약금액:
  • 지역: Indonesia 발주처: PT.Pertamina
    공사명: RDMP Project PKG-5 Insulation Work 사업분야: Petrochemical 공종: RDMP Project PKG-5 Insulation Work
    기간: 2022.11.01~2024.08.16 계약금액:
  • 지역: Korea 발주처: Lotte Chemical Co., Ltd
    공사명: Lotte Chemical Daesan ES PJT Fire Fighting UG Piping Construction 사업분야: Petrochemical 공종: Lotte Chemical Daesan ES PJT Fire Fighting UG Piping Construction
    기간: 2022.10.31~2023.05.31 계약금액:
  • 지역: Korea 발주처: LG Chem Co., Ltd
    공사명: Chemistry Daesan P4 PROJECT Construction Plant Machine/Piping Construction-6 사업분야: Petrochemical 공종: Chemistry Daesan P4 PROJECT Construction Plant Machine/Piping Construction-6
    기간: 2022.10.25~2023.12.31 계약금액:
  • 지역: Korea 발주처: POSCO Co., Ltd
    공사명: Pohang STS2 Cold Rolling_Mechanical Equipment Performance Restoration_Construction_Estimated Contract 사업분야: Steel Mill 공종: Pohang STS2 Cold Rolling_Mechanical Equipment Performance Restoration_Construction_Estimated Contract
    기간: 2022.10.21~2022.12.31 계약금액:
  • 지역: Korea 발주처: LG Chem Co., Ltd
    공사명: HDPE 3 Factory TA Catalyst Decantation Replacement Construction 사업분야: Petrochemical 공종: HDPE 3 Factory TA Catalyst Decantation Replacement Construction
    기간: 2022.10.21~2022.12.30 계약금액:
  • 지역: Korea 발주처: POSCO Co., Ltd
    공사명: Pohang 6 Coke New (Construction) 9th Insulation 사업분야: Steel Mill 공종: Pohang 6 Coke New (Construction) 9th Insulation
    기간: 2022.10.21~2023.12.31 계약금액:
  • 지역: Korea 발주처: POSCO Co., Ltd
    공사명: Po) Machine Corporation (PCI) Cold Cold Stream Flood 사업분야: Steel Mill 공종: Po) Machine Corporation (PCI) Cold Cold Stream Flood
    기간: 2022.10.21~2023.03.30 계약금액:
  • 지역: Korea 발주처: LG Chem Co., Ltd
    공사명: POE Pilot P5 Commissioning Support Service Support (piping) 사업분야: Petrochemical 공종: POE Pilot P5 Commissioning Support Service Support (piping)
    기간: 2022.10.19~2022.12.30 계약금액:
  • 지역: Korea 발주처: Hyundai Steel Co., Ltd
    공사명: 2 Grow furnace of handrail replacement construction around the tank 사업분야: Steel Mill 공종: 2 Grow furnace of handrail replacement construction around the tank
    기간: 2022.10.19~2022.12.13 계약금액:
  • 지역: Korea 발주처: Hanju Co., Ltd
    공사명: Insulation work during Hanju gas combined heat and power generation 사업분야: Power 공종: Insulation work during Hanju gas combined heat and power generation
    기간: 2022.10.17~2024.06.30 계약금액:
Download the Performance List