DAEAH E&C is a specialized construction company for plant mechanical equipment.

Firefighting

MAIN PROJECT

No List.
공지사항 목록
Region Region Owner Primary
Contractor
Name of Project Business
Field
Construction
Type
Period Contract Amount
(KRW 1,000)
Korea LG Chem Co., Ltd D&O Co., Ltd Chemical Daesan UT / OS Project Daesan Plant Common Infrastructure Investment Work Petrochemical Mech/Piping/Stl.Str 2017.05.16~2018.09.30
PANAMA AES Panama POSCO E&C Co., Ltd Costa Norte LNG Terminal Project Gas Insulation 2017.04.19~2019.08.31
Korea Korea Hydro & Nuclear Power Co., Ltd Hyundai Engineering & Construction Co., Ltd Shinhanwool Nuclear Power 1 & 2 Main Facility Construction Mechanical and Turbine Nuclear Mech 2017.04.13~2018.12.31
Korea S-Oil Co., Ltd Daewoo Engineering & Construction Co., Ltd Ulsan S-OIL Residue Upgrading Complex Project Insulation Work (Package 1 of Area 2) Refinery Insulation 2017.04.10~2018.07.31
Korea Pohang E&N Co., Ltd POSCO E&C Co., Ltd Pohang municipal solid waste energy system establishment ETC Mech 2017.03.28~2018.12.23
Korea Boryeong LNG Terminal Co., Ltd GS Engineering & Construction Co., Ltd Boryeong LNG Terminal Proejct Power Insulation 2017.03.20~2019.09.30
Korea Boryeong LNG Terminal Co., Ltd SK Engineering & Construction Co., Ltd Boryeong LNG Terminal Project Phase 2-1 Cryogenic Insulation Work Gas Cryogenic Insulation Work 2017.03.20~2019.11.30
Indonesia Sarula Operation Hyundai Engineering & Construction Co., Ltd Sarulla Geothermal Power Plant Project Manpower Supply Agreement Power Mech/Piping/Stl.Str 2017.02.01~2018.04.30
Korea S-Oil Co., Ltd Daewoo Engineering & Construction Co., Ltd Ulsan S-OIL RUC Insulation Work for C4-Splitter(Package2 of Area 3) Refinery Insulation 2017.01.05~2017.02.15
Saudi ARAMCO Hanwha Engineering & Construction Co., Ltd SAUDI JRTP PKG.14 Project Refinery Mech/Piping/Stl.Str 2016.11.15~2019.04.30
Uzbekistan Lukoil Uzbekistan Operationg Company Hyundai Engineering Co., Ltd Kandym Fields Gas Processing Plant Project Gas Insulation 2016.11.01~2018.07.31
Malaysia Lotte Chemical Co., Ltd Lotte Construction Co., Ltd LOTTE Chemical TE3 Project Insulation Work Petrochemical Insulation 2016.09.15~2017.08.31
  • 지역: Korea 발주처: LG Chem Co., Ltd
    공사명: Chemical Daesan UT / OS Project Daesan Plant Common Infrastructure Investment Work 사업분야: Petrochemical 공종: Chemical Daesan UT / OS Project Daesan Plant Common Infrastructure Investment Work
    기간: 2017.05.16~2018.09.30 계약금액:
  • 지역: PANAMA 발주처: AES Panama
    공사명: Costa Norte LNG Terminal Project 사업분야: Gas 공종: Costa Norte LNG Terminal Project
    기간: 2017.04.19~2019.08.31 계약금액:
  • 지역: Korea 발주처: Korea Hydro & Nuclear Power Co., Ltd
    공사명: Shinhanwool Nuclear Power 1 & 2 Main Facility Construction Mechanical and Turbine 사업분야: Nuclear 공종: Shinhanwool Nuclear Power 1 & 2 Main Facility Construction Mechanical and Turbine
    기간: 2017.04.13~2018.12.31 계약금액:
  • 지역: Korea 발주처: S-Oil Co., Ltd
    공사명: Ulsan S-OIL Residue Upgrading Complex Project Insulation Work (Package 1 of Area 2) 사업분야: Refinery 공종: Ulsan S-OIL Residue Upgrading Complex Project Insulation Work (Package 1 of Area 2)
    기간: 2017.04.10~2018.07.31 계약금액:
  • 지역: Korea 발주처: Pohang E&N Co., Ltd
    공사명: Pohang municipal solid waste energy system establishment 사업분야: ETC 공종: Pohang municipal solid waste energy system establishment
    기간: 2017.03.28~2018.12.23 계약금액:
  • 지역: Korea 발주처: Boryeong LNG Terminal Co., Ltd
    공사명: Boryeong LNG Terminal Proejct 사업분야: Power 공종: Boryeong LNG Terminal Proejct
    기간: 2017.03.20~2019.09.30 계약금액:
  • 지역: Korea 발주처: Boryeong LNG Terminal Co., Ltd
    공사명: Boryeong LNG Terminal Project Phase 2-1 Cryogenic Insulation Work 사업분야: Gas 공종: Boryeong LNG Terminal Project Phase 2-1 Cryogenic Insulation Work
    기간: 2017.03.20~2019.11.30 계약금액:
  • 지역: Indonesia 발주처: Sarula Operation
    공사명: Sarulla Geothermal Power Plant Project Manpower Supply Agreement 사업분야: Power 공종: Sarulla Geothermal Power Plant Project Manpower Supply Agreement
    기간: 2017.02.01~2018.04.30 계약금액:
  • 지역: Korea 발주처: S-Oil Co., Ltd
    공사명: Ulsan S-OIL RUC Insulation Work for C4-Splitter(Package2 of Area 3) 사업분야: Refinery 공종: Ulsan S-OIL RUC Insulation Work for C4-Splitter(Package2 of Area 3)
    기간: 2017.01.05~2017.02.15 계약금액:
  • 지역: Saudi 발주처: ARAMCO
    공사명: SAUDI JRTP PKG.14 Project 사업분야: Refinery 공종: SAUDI JRTP PKG.14 Project
    기간: 2016.11.15~2019.04.30 계약금액:
  • 지역: Uzbekistan 발주처: Lukoil Uzbekistan Operationg Company
    공사명: Kandym Fields Gas Processing Plant Project 사업분야: Gas 공종: Kandym Fields Gas Processing Plant Project
    기간: 2016.11.01~2018.07.31 계약금액:
  • 지역: Malaysia 발주처: Lotte Chemical Co., Ltd
    공사명: LOTTE Chemical TE3 Project Insulation Work 사업분야: Petrochemical 공종: LOTTE Chemical TE3 Project Insulation Work
    기간: 2016.09.15~2017.08.31 계약금액:
Download the Performance List