Region Region Owner Primary
Contractor
Name of Project Business
Field
Construction
Type
Period Contract Amount
(KRW 1,000)
Korea LG Chem Co., Ltd LG Chem Co., Ltd PVC2 K-5 HWM PU EJECTOR Steam LINE blocking work Petrochemical Piping 2022.11.02~2022.12.30
Korea Hana Asset Trust Co., Ltd Hyundai Engineering & Construction Co., Ltd Air Conditioning Fire Construction at Hill State Daemyeong Central 2nd(section 2) Housing Facility Fire piping 2022.11.01~2026.02.24
Indonesia PT.Pertamina Hyundai Engineering Co., Ltd RDMP Project PKG-5 Insulation Work Petrochemical Mech/Piping 2022.11.01~2024.08.16
Korea Lotte Chemical Co., Ltd Lotte Chemical Co., Ltd Lotte Chemical Daesan ES PJT Fire Fighting UG Piping Construction Petrochemical Fire piping 2022.10.31~2023.05.31
Korea LG Chem Co., Ltd ZICNA Co., Ltd Chemistry Daesan P4 PROJECT Construction Plant Machine/Piping Construction-6 Petrochemical Mech/Piping 2022.10.25~2023.12.31
Korea POSCO Co., Ltd POSCO E&C Co., Ltd Pohang STS2 Cold Rolling_Mechanical Equipment Performance Restoration_Construction_Estimated Contract Steel Mill Mech 2022.10.21~2022.12.31
Korea LG Chem Co., Ltd LG Chem Co., Ltd HDPE 3 Factory TA Catalyst Decantation Replacement Construction Petrochemical Piping 2022.10.21~2022.12.30
Korea POSCO Co., Ltd POSCO E&C Co., Ltd Pohang 6 Coke New (Construction) 9th Insulation Steel Mill Insulation 2022.10.21~2023.12.31
Korea POSCO Co., Ltd Plantec Co., Ltd Po) Machine Corporation (PCI) Cold Cold Stream Flood Steel Mill Mech/Piping 2022.10.21~2023.03.30
Korea LG Chem Co., Ltd LG Chem Co., Ltd POE Pilot P5 Commissioning Support Service Support (piping) Petrochemical Piping 2022.10.19~2022.12.30
Korea Hyundai Steel Co., Ltd Hyundai Steel Co., Ltd 2 Grow furnace of handrail replacement construction around the tank Steel Mill Scafolding 2022.10.19~2022.12.13
Korea Hanju Co., Ltd Hanwha Engineering & Construction Co., Ltd Insulation work during Hanju gas combined heat and power generation Power Insulation 2022.10.17~2024.06.30
  • 지역: Korea 발주처: LG Chem Co., Ltd
    공사명: PVC2 K-5 HWM PU EJECTOR Steam LINE blocking work 사업분야: Petrochemical 공종: PVC2 K-5 HWM PU EJECTOR Steam LINE blocking work
    기간: 2022.11.02~2022.12.30 계약금액:
  • 지역: Korea 발주처: Hana Asset Trust Co., Ltd
    공사명: Air Conditioning Fire Construction at Hill State Daemyeong Central 2nd(section 2) 사업분야: Housing Facility 공종: Air Conditioning Fire Construction at Hill State Daemyeong Central 2nd(section 2)
    기간: 2022.11.01~2026.02.24 계약금액:
  • 지역: Indonesia 발주처: PT.Pertamina
    공사명: RDMP Project PKG-5 Insulation Work 사업분야: Petrochemical 공종: RDMP Project PKG-5 Insulation Work
    기간: 2022.11.01~2024.08.16 계약금액:
  • 지역: Korea 발주처: Lotte Chemical Co., Ltd
    공사명: Lotte Chemical Daesan ES PJT Fire Fighting UG Piping Construction 사업분야: Petrochemical 공종: Lotte Chemical Daesan ES PJT Fire Fighting UG Piping Construction
    기간: 2022.10.31~2023.05.31 계약금액:
  • 지역: Korea 발주처: LG Chem Co., Ltd
    공사명: Chemistry Daesan P4 PROJECT Construction Plant Machine/Piping Construction-6 사업분야: Petrochemical 공종: Chemistry Daesan P4 PROJECT Construction Plant Machine/Piping Construction-6
    기간: 2022.10.25~2023.12.31 계약금액:
  • 지역: Korea 발주처: POSCO Co., Ltd
    공사명: Pohang STS2 Cold Rolling_Mechanical Equipment Performance Restoration_Construction_Estimated Contract 사업분야: Steel Mill 공종: Pohang STS2 Cold Rolling_Mechanical Equipment Performance Restoration_Construction_Estimated Contract
    기간: 2022.10.21~2022.12.31 계약금액:
  • 지역: Korea 발주처: LG Chem Co., Ltd
    공사명: HDPE 3 Factory TA Catalyst Decantation Replacement Construction 사업분야: Petrochemical 공종: HDPE 3 Factory TA Catalyst Decantation Replacement Construction
    기간: 2022.10.21~2022.12.30 계약금액:
  • 지역: Korea 발주처: POSCO Co., Ltd
    공사명: Pohang 6 Coke New (Construction) 9th Insulation 사업분야: Steel Mill 공종: Pohang 6 Coke New (Construction) 9th Insulation
    기간: 2022.10.21~2023.12.31 계약금액:
  • 지역: Korea 발주처: POSCO Co., Ltd
    공사명: Po) Machine Corporation (PCI) Cold Cold Stream Flood 사업분야: Steel Mill 공종: Po) Machine Corporation (PCI) Cold Cold Stream Flood
    기간: 2022.10.21~2023.03.30 계약금액:
  • 지역: Korea 발주처: LG Chem Co., Ltd
    공사명: POE Pilot P5 Commissioning Support Service Support (piping) 사업분야: Petrochemical 공종: POE Pilot P5 Commissioning Support Service Support (piping)
    기간: 2022.10.19~2022.12.30 계약금액:
  • 지역: Korea 발주처: Hyundai Steel Co., Ltd
    공사명: 2 Grow furnace of handrail replacement construction around the tank 사업분야: Steel Mill 공종: 2 Grow furnace of handrail replacement construction around the tank
    기간: 2022.10.19~2022.12.13 계약금액:
  • 지역: Korea 발주처: Hanju Co., Ltd
    공사명: Insulation work during Hanju gas combined heat and power generation 사업분야: Power 공종: Insulation work during Hanju gas combined heat and power generation
    기간: 2022.10.17~2024.06.30 계약금액: