Region Region Owner Primary
Contractor
Name of Project Business
Field
Construction
Type
Period Contract Amount
(KRW 1,000)
Korea Lotte Chemical Co., Ltd Lotte Construction Co., Ltd Lotte Chemical POE Project Mechanical Piping Steel Structure Construction Petrochemical Mech/Piping/Stl.Str 2018.04.23~2019.08.14
Korea Lotte Chemical Co., Ltd Lotte Construction Co., Ltd Lotte Chemical H-NC3 insulation work Petrochemical Insulation 2018.04.09~2019.03.31
Korea HD Hyundai Oilbank Co., Ltd Hyundai Engineering & Construction Co., Ltd Daesan HDO REVAMP DCU Mechanical Piping Construction 2 Refinery Mech/Piping 2018.04.09~2018.12.31
Korea POSCO Co., Ltd POSCO E&C Co., Ltd High manganese steel demonstration tank construction machinery installation work Steel Mill Mech 2018.04.02~2018.09.30
Korea Hanwha Solution Co., Ltd Hanwha Engineering & Construction Co., Ltd THE project (DCPD hydrogenated petroleum resin) EPC SMP Petrochemical Mech/Piping/Stl.Str 2018.03.22~2019.01.31
Korea GS Caltex Co., Ltd GS Engineering & Construction Co., Ltd 3NE Project Mechanical / Piping Installation Petrochemical Mech/Piping 2018.03.19~2019.04.30
Korea POSCO Co., Ltd POSCO E&C Co., Ltd PosNET PP-3 Insulation Steel Mill Insulation 2018.03.13~2018.08.31
Korea POSCO Co., Ltd POSCO E&C Co., Ltd Gwangyang LNG Terminal LPG Storage Tank EPC Project Trim Condenser Improvement Construction Gas Mech 2018.03.02~2018.08.31
Korea Korea Midland Power Co., Ltd HJ Heavy Industries Co., Ltd Shin Seocheon Thermal Power Plant Mechanism construction Power Mech/Piping 2018.03.01~2020.06.30
UAE TAKREER GS Engineering & Construction Co., Ltd Ruwais Refinery Expansion Package 2 Project SMP Punch Work(PAC Exceptions) Refinery Mech/Piping/Stl.Str 2018.03.01~2018.08.30
Korea Lotte Chemical Co., Ltd Lotte Construction Co., Ltd Lotte Chemical LPEL Tank Project Replacement of piping around Heat Exchanger Petrochemical Piping 2018.02.14~2018.02.28
Kuwait KNPC Hyundai Engineering & Construction Co., Ltd AL-ZOUR LNG IMPORT PROJECT(LNGI)KUSAIT LNG Inner Tanks_Package #3 Gas Tank 2018.02.08~2022.02.28
  • 지역: Korea 발주처: Lotte Chemical Co., Ltd
    공사명: Lotte Chemical POE Project Mechanical Piping Steel Structure Construction 사업분야: Petrochemical 공종: Lotte Chemical POE Project Mechanical Piping Steel Structure Construction
    기간: 2018.04.23~2019.08.14 계약금액:
  • 지역: Korea 발주처: Lotte Chemical Co., Ltd
    공사명: Lotte Chemical H-NC3 insulation work 사업분야: Petrochemical 공종: Lotte Chemical H-NC3 insulation work
    기간: 2018.04.09~2019.03.31 계약금액:
  • 지역: Korea 발주처: HD Hyundai Oilbank Co., Ltd
    공사명: Daesan HDO REVAMP DCU Mechanical Piping Construction 2 사업분야: Refinery 공종: Daesan HDO REVAMP DCU Mechanical Piping Construction 2
    기간: 2018.04.09~2018.12.31 계약금액:
  • 지역: Korea 발주처: POSCO Co., Ltd
    공사명: High manganese steel demonstration tank construction machinery installation work 사업분야: Steel Mill 공종: High manganese steel demonstration tank construction machinery installation work
    기간: 2018.04.02~2018.09.30 계약금액:
  • 지역: Korea 발주처: Hanwha Solution Co., Ltd
    공사명: THE project (DCPD hydrogenated petroleum resin) EPC SMP 사업분야: Petrochemical 공종: THE project (DCPD hydrogenated petroleum resin) EPC SMP
    기간: 2018.03.22~2019.01.31 계약금액:
  • 지역: Korea 발주처: GS Caltex Co., Ltd
    공사명: 3NE Project Mechanical / Piping Installation 사업분야: Petrochemical 공종: 3NE Project Mechanical / Piping Installation
    기간: 2018.03.19~2019.04.30 계약금액:
  • 지역: Korea 발주처: POSCO Co., Ltd
    공사명: PosNET PP-3 Insulation 사업분야: Steel Mill 공종: PosNET PP-3 Insulation
    기간: 2018.03.13~2018.08.31 계약금액:
  • 지역: Korea 발주처: POSCO Co., Ltd
    공사명: Gwangyang LNG Terminal LPG Storage Tank EPC Project Trim Condenser Improvement Construction 사업분야: Gas 공종: Gwangyang LNG Terminal LPG Storage Tank EPC Project Trim Condenser Improvement Construction
    기간: 2018.03.02~2018.08.31 계약금액:
  • 지역: Korea 발주처: Korea Midland Power Co., Ltd
    공사명: Shin Seocheon Thermal Power Plant Mechanism construction 사업분야: Power 공종: Shin Seocheon Thermal Power Plant Mechanism construction
    기간: 2018.03.01~2020.06.30 계약금액:
  • 지역: UAE 발주처: TAKREER
    공사명: Ruwais Refinery Expansion Package 2 Project SMP Punch Work(PAC Exceptions) 사업분야: Refinery 공종: Ruwais Refinery Expansion Package 2 Project SMP Punch Work(PAC Exceptions)
    기간: 2018.03.01~2018.08.30 계약금액:
  • 지역: Korea 발주처: Lotte Chemical Co., Ltd
    공사명: Lotte Chemical LPEL Tank Project Replacement of piping around Heat Exchanger 사업분야: Petrochemical 공종: Lotte Chemical LPEL Tank Project Replacement of piping around Heat Exchanger
    기간: 2018.02.14~2018.02.28 계약금액:
  • 지역: Kuwait 발주처: KNPC
    공사명: AL-ZOUR LNG IMPORT PROJECT(LNGI)KUSAIT LNG Inner Tanks_Package #3 사업분야: Gas 공종: AL-ZOUR LNG IMPORT PROJECT(LNGI)KUSAIT LNG Inner Tanks_Package #3
    기간: 2018.02.08~2022.02.28 계약금액: